Chapter 5: FEED Decisions Abstract
This section of the report provides a summary of key decisions and design changes made during FEED that have resulted from the development of the End-to-End solution and the design works conducted by each of the Consortium Partners. The information described in this section captures the design decisions and changes that have had the most prominent impact on the End-to-End Basis of Design.
For each key design change/decision, the background, options considered and the final outcome is described. The ScottishPower CCS Consortium Decision Register can be found in PDFs below.
The appropriate summary section from the Feed Close Out Report can be downloaded as a PDF below
The main text of the FEED Close Out Report, together with the supporting appendix for this section can be downloaded as PDF files below
FEED Close Out Report
Key FEED Decisions