Chapter 6: Technical Design - Pipeline and Platform

This chapter is devoted to the transportation and injection infrastructure requirements of the Kingsnorth Carbon Capture and Storage development. This encompasses a 36” (outside diameter) pipeline which runs onshore for approx 10 km and offshore in the Southern North Sea for 260 km, a platform in the vicinity of the Hewett field location, and appropriate facilities both for the conditioning of CO2 before pipeline entry and the processing of the CO2 stream prior to injection into the sequestration site. The chapter highlights in particular the following areas:-

  • Critical assumptions;
  • Platform Concept Selection;
  • Transport Solution Selection;
  • Pipeline Key Issues;
  • Pipeline Pre-Commissioning;
  • Temperature;
  • Emergency Shutdown;
  • Personnel Safety;
  • Venting;
  • Flow Assurance Modelling.

Throughout the execution of the work described in this chapter significant opportunity was taken to ensure that the interfaces from capture (and compression) to pipeline/platform and to wells/storage were managed closely. This was achieved by cross system interface management meetings organized to consider interface issues and to compare issues raised in separate HAZIDs. The purpose of conceptual design has been to identify the problems to be addressed comprehensively by the next stage of FEED and this suite of reports provides valuable insights to the challenges faced.

All aspects of establishing an agreed philosophy for design and operation of a storage and transport system for CCS begin with understanding what the initial CO2 flow conditions will be at the interface between the well perforations and the reservoir (i.e. at the sandstone face at the bottom of the well).

Further supporting documents for chapter 6 of the Key Knowledge Reference Book can be downloaded below

6.4 Onshore Pipeline Project Data Size: [183 KB] File Type: [.pdf]
6.5 Offshore Pipeline Project Data Size: [476 KB] File Type: [.pdf]
6.6 Onshore and Offshore Pipeline Design Philosophy Size: [1.23 MB] File Type: [.pdf]
6.8 Pipeline Testing and Drying Philosophy Size: [153 KB] File Type: [.pdf]
6.9 Pigging Philosophy Size: [244 KB] File Type: [.pdf]
6.10 Offshore Infrastructure Project Data Size: [98 KB] File Type: [.pdf]
6.11 Structural Design Philosophy Size: [115 KB] File Type: [.pdf]
6.13 Heating System Design Philosophy Size: [515 KB] File Type: [.pdf]
6.14 Offshore Power Supply Design Philosophy Size: [359 KB] File Type: [.pdf]
6.15 Drains System Design Philosophy Size: [121 KB] File Type: [.pdf]
6.19 Process Isolation System Design Philosophy Size: [189 KB] File Type: [.pdf]
6.21 Offshore Supply and Logistics Philosophy Size: [192 KB] File Type: [.pdf]
6.24 Steady State Analysis (Pipeline) Size: [2.09 MB] File Type: [.pdf]
6.25 Transient Analysis - Start Up (Pipeline) Size: [1.79 MB] File Type: [.pdf]
6.30 Overall System Network Diagram Size: [162 KB] File Type: [.pdf]
6.31 Onshore Blowdown Conceptual Design Report Size: [401 KB] File Type: [.pdf]
6.33 Topographical Survey Specification Size: [176 KB] File Type: [.pdf]
6.34.2 Pipeline Route Survey Charts Size: [59.78 MB] File Type: [.pdf]
6.34.3 Pipeline Route Habitat Survey Report Size: [3.40 MB] File Type: [.pdf]
6.35 Offshore Pipeline Route Selection Report Size: [1.17 MB] File Type: [.pdf]
6.36 High Level Field Layout Alignments Size: [3.37 MB] File Type: [.pdf]
6.39 Offshore Concept Screening Report Size: [788 KB] File Type: [.pdf]
6.40 Offshore Platform HAZID-ENVID Report Size: [436 KB] File Type: [.pdf]
6.42 Interface Report CO2 Pipeline & Wells Size: [328 KB] File Type: [.pdf]
6.45 Offshore Venting and Dispersion Study Report Size: [510 KB] File Type: [.pdf]
6.50 Offshore Control System Philosophy Size: [87 KB] File Type: [.pdf]
6.51 Offshore ESD System Philosophy Size: [112 KB] File Type: [.pdf]
6.52 Transient Analysis - Pigging (Pipeline) Size: [701 KB] File Type: [.pdf]
6.53 Materials Selection for HSE Submission Size: [366 KB] File Type: [.pdf]
6.54 Hydrate Mitigation Study Report Size: [164 KB] File Type: [.pdf]
6.56 Platform & Pipeline Commissioning Philosophy Size: [167 KB] File Type: [.pdf]
6.57 Onshore Pipeline Mechanical Design Report Size: [728 KB] File Type: [.pdf]
6.60 Heat & Mass Balance Demo Phase and Full Flow Size: [988 KB] File Type: [.pdf]
6.62 Overall Platform ESD Hierarchy Diagram Size: [163 KB] File Type: [.pdf]
6.63 Pipeline HAZID ENVID Report Size: [236 KB] File Type: [.pdf]

Promotions

|

Connect With DECC

|

Latest on DECC.GOV.UK

Marine Energy Array Demonstrator (MEAD)
Updated 4 minutes ago Marine Energy Array Demonstrator (MEAD) capital grant scheme.
Fuel poverty statistics
Updated 49 minutes ago A household is said to be in fuel poverty if it needs to spend more than 10% of its income on fuel to maintain a satisfactory heating regime (usually
Jobs
Updated 3 days ago DECC external vacancies

Explore Department of Energy and Climate Change

About Us
Who we are, our goals and commitment, Jobs, Economics and social research in DECC...
Tackling Climate Change
What is climate change, Saving energy and C02, Carbon Plan, Green Deal, Smart Meters...
Meeting Energy Demand
Nuclear, Oil and Gas, Renewables, Energy security, Development consents and planning...
Cutting Emissions
Carbon budgets, Carbon capture and storage, EU Emissions Trading Scheme, CRC Energy Efficiency Scheme...
Funding and Support
Funding opportunities, Fuel poverty, Warm Front, Coal health claims...
Policy and Legislation
Policy and guidance A-Z, Our legislation...
Consultations
Search by topic, by status...
Statistics
Energy statistics, climate change statistics, fuel poverty statistics...
Publications
Search by keyword, by date, by category...
News
Latest news, Press releases, Speeches...
Glossary
Acronyms

Partners & Help

  • Directgov logo
  • info4local logo
  • The Natioinal Archives logo
  • Business Link logo
Link to home page